Yellow Line
Arjan Garh to DLF Phase 1 Metro Route
~6 mins₹21 (approx.)3 stations
First Train (approx.)
5:00 AM
Confirm with DMRC
Last Train (approx.)
12:00 AM
Confirm with DMRC
Route Timeline
Yellow Line
Gate / Exit – Arjan Garh Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Gate / Exit – DLF Phase 1 Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Related routes
Return trip
DLF Phase 1 → Arjan GarhAlong this route
Shorter trips from Arjan Garh toward DLF Phase 1
Continue from a stop to DLF Phase 1
From Arjan Garh to a connected station
One stop away on the network — useful for nearby trips or first/last mile.
From a connected station to DLF Phase 1
Reach DLF Phase 1 from a station directly connected to it.