Pink Line
Central Secretariat to South Extension Metro Route
~10 mins₹21 (approx.)5 stations
First Train (approx.)
5:00 AM
Confirm with DMRC
Last Train (approx.)
12:00 AM
Confirm with DMRC
Route Timeline
Pink Line
Platform 2 • Gate 1
Destination • Gate 1
Gate / Exit – Central Secretariat Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Vijay Chowk |
| 2 | Sardar Patel Marg |
| 3 | Rail Bhawan |
| 4 | Kartavya Path |
Gate / Exit – South Extension Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Related routes
Return trip
South Extension → Central SecretariatAlong this route
Shorter trips from Central Secretariat toward South Extension
Continue from a stop to South Extension
From Central Secretariat to a connected station
One stop away on the network — useful for nearby trips or first/last mile.
From a connected station to South Extension
Reach South Extension from a station directly connected to it.