Yellow Line
Chawri Bazar to Seelampur Metro Route
~8 mins₹21 (approx.)4 stations
First Train (approx.)
5:00 AM
Confirm with DMRC
Last Train (approx.)
12:00 AM
Confirm with DMRC
Route Timeline
Yellow Line
Gate / Exit – Chawri Bazar Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Gate / Exit – Seelampur Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Related routes
Return trip
Seelampur → Chawri BazarAlong this route
Shorter trips from Chawri Bazar toward Seelampur
Continue from a stop to Seelampur
From Chawri Bazar to a connected station
One stop away on the network — useful for nearby trips or first/last mile.
From a connected station to Seelampur
Reach Seelampur from a station directly connected to it.