Delhi Metro Map Route

Yellow Line

Guru Tegh Bahadur Nagar to Uttam Nagar East Metro Route

~48 mins54 (approx.)24 stations

First Train (approx.)

5:00 AM

Confirm with DMRC

Last Train (approx.)

12:00 AM

Confirm with DMRC

Gate / Exit – Guru Tegh Bahadur Nagar Metro Station

GateExit / Location
1Main Exit

Gate / Exit – Uttam Nagar East Metro Station

GateExit / Location
1Main Exit

Along this route

Shorter trips from Guru Tegh Bahadur Nagar toward Uttam Nagar East

From Guru Tegh Bahadur Nagar to a connected station

One stop away on the network — useful for nearby trips or first/last mile.

From a connected station to Uttam Nagar East

Reach Uttam Nagar East from a station directly connected to it.

Lines on this route