Red Line
Kanhaiya Nagar to Pul Bangash Metro Route
~8 mins₹21 (approx.)4 stations
First Train (approx.)
5:00 AM
Confirm with DMRC
Last Train (approx.)
12:00 AM
Confirm with DMRC
Route Timeline
Red Line
Gate / Exit – Kanhaiya Nagar Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Gate / Exit – Pul Bangash Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Related routes
Return trip
Pul Bangash → Kanhaiya NagarAlong this route
Shorter trips from Kanhaiya Nagar toward Pul Bangash
Continue from a stop to Pul Bangash
From Kanhaiya Nagar to a connected station
One stop away on the network — useful for nearby trips or first/last mile.
From a connected station to Pul Bangash
Reach Pul Bangash from a station directly connected to it.