Delhi Metro Map Route

Blue Line

Mayur Vihar Phase-1 to Tughlakabad Metro Route

~42 mins43 (approx.)21 stations

First Train (approx.)

5:00 AM

Confirm with DMRC

Last Train (approx.)

12:00 AM

Confirm with DMRC

Gate / Exit – Mayur Vihar Phase-1 Metro Station

GateExit / Location
1Main Exit

Gate / Exit – Tughlakabad Metro Station

GateExit / Location
1Main Exit

From Mayur Vihar Phase-1 to a connected station

One stop away on the network — useful for nearby trips or first/last mile.

From a connected station to Tughlakabad

Reach Tughlakabad from a station directly connected to it.

Lines on this route