Delhi Metro Map Route

Pink Line

Netaji Subash Place to Arjan Garh Metro Route

~40 mins43 (approx.)20 stations

First Train (approx.)

5:00 AM

Confirm with DMRC

Last Train (approx.)

12:00 AM

Confirm with DMRC

Gate / Exit – Netaji Subash Place Metro Station

GateExit / Location
1Main Exit

Gate / Exit – Arjan Garh Metro Station

GateExit / Location
1Main Exit

From Netaji Subash Place to a connected station

One stop away on the network — useful for nearby trips or first/last mile.

From a connected station to Arjan Garh

Reach Arjan Garh from a station directly connected to it.

Lines on this route