Red Line
Netaji Subash Place to Shastri Nagar Metro Route
~8 mins₹21 (approx.)4 stations
First Train (approx.)
5:00 AM
Confirm with DMRC
Last Train (approx.)
12:00 AM
Confirm with DMRC
Route Timeline
Red Line
Platform 2 • Gate 1
Destination • Gate 1
Gate / Exit – Netaji Subash Place Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Gate / Exit – Shastri Nagar Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Related routes
Return trip
Shastri Nagar → Netaji Subash PlaceAlong this route
Shorter trips from Netaji Subash Place toward Shastri Nagar
Continue from a stop to Shastri Nagar
From Netaji Subash Place to a connected station
One stop away on the network — useful for nearby trips or first/last mile.
From a connected station to Shastri Nagar
Reach Shastri Nagar from a station directly connected to it.