Pink Line
South Extension to Shakurpur Metro Route
~20 mins₹32 (approx.)10 stations
First Train (approx.)
5:00 AM
Confirm with DMRC
Last Train (approx.)
12:00 AM
Confirm with DMRC
Route Timeline
Pink Line
Platform 2 • Gate 1
Destination • Gate 1
Gate / Exit – South Extension Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Gate / Exit – Shakurpur Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Related routes
Return trip
Shakurpur → South ExtensionAlong this route
Shorter trips from South Extension toward Shakurpur
From South Extension to a connected station
One stop away on the network — useful for nearby trips or first/last mile.
From a connected station to Shakurpur
Reach Shakurpur from a station directly connected to it.