Green Line
Udyog Nagar to Kanhaiya Nagar Metro Route
~20 mins₹32 (approx.)10 stations
First Train (approx.)
5:00 AM
Confirm with DMRC
Last Train (approx.)
12:00 AM
Confirm with DMRC
Route Timeline
Green Line
Gate / Exit – Udyog Nagar Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Gate / Exit – Kanhaiya Nagar Metro Station
| Gate | Exit / Location |
|---|---|
| 1 | Main Exit |
Related routes
Return trip
Kanhaiya Nagar → Udyog NagarAlong this route
Shorter trips from Udyog Nagar toward Kanhaiya Nagar
Continue from a stop to Kanhaiya Nagar
From Udyog Nagar to a connected station
One stop away on the network — useful for nearby trips or first/last mile.
From a connected station to Kanhaiya Nagar
Reach Kanhaiya Nagar from a station directly connected to it.